Show pageOld revisionsBacklinksBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. ====== Firmware for PWS2-30K (single-phase) ====== This firmware is to make the PWS2-30K to adapt to 480V single phase output. ===== 2021/4/29 DSP Version 207 ONLY!===== * Version: D207 for PWS2-30K single phase * Fixed some bugs <WRAP center round download 60%> {{ :manual:pws2-30k:pcs30_u1_v207.rar |Click to download}} </WRAP> ===== 2021/1/13 HMI Interface ONLY!===== * Version: D200 for PWS2-30K single phase * Fixed some bugs <WRAP center round download 60%> {{ :manual:pws2-30k:pcs30single-dwin-v200.7z |Click to download}} </WRAP> ===== 2020/3/18 HMI core ONLY!===== * Version: S30011 for PWS2-30K single phase * The "beep" warning can be turned off remotely now * When EMS channel is selected as RS485, the EMS can still read via Ethernet <WRAP center round download 60%> {{ :manual:pws2-30k:pcs30kw_app_v30011.zip |Click to download}} </WRAP> ===== 2019/5/24 ===== * Version: D206 C120 S3000 M200 * When entering standby(idle) mode, the fans will stop rotation in 5 minutes <WRAP center round download 60%> {{:manual:pws2-30k:singlephasefirmwared206s3000m200.zip|Click to download}} </WRAP> ===== 2019/4/15 ===== * Version: D205 C120 S3000 M200 * Added standby(idle) mode * Added fast off-grid operation function. The grid-tied to off-grid toggling is optimized. \\ When the grid outage occurs, just turn off the disconnect. And send “off-grid” register, the PCS will automatically clear the fault flags and start in grid forming mode. No need to send clear fault and start command, this will make the starting time 6~7 seconds. * Fixed some bugs <WRAP center round download 60%> {{ :manual:pws2-30k:singlephasefirmwared205s3000m200.zip |Click to download}} </WRAP> manual/pws2-30k/download_firmware_for_pws2-30k_single-phase.txt Last modified: 2021/04/28 23:26by hedy