Show pageOld revisionsBacklinksBack to top This page is read only. You can view the source, but not change it. Ask your administrator if you think this is wrong. ====== Lead time ====== the standard lead time for Sinexcel inverter products is 8 weeks faq/lead_time.txt Last modified: 2020/09/16 21:41(external edit)