Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
manual:pws2-30k:installation [2019/01/03 03:24] admin |
manual:pws2-30k:installation [2020/09/16 22:16] (current) |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Installation ====== | + | ====== Installation |
===== Physical installation===== | ===== Physical installation===== | ||
Line 39: | Line 39: | ||
* Please ensure that the installation surface is firm and meets the load bearing requirements for inverter installation. | * Please ensure that the installation surface is firm and meets the load bearing requirements for inverter installation. | ||
* Do NOT install the inverter onto the wall with poor sound insulation in the residence district so as to prevent any interruption caused by operation noise against the residents in the residence district. | * Do NOT install the inverter onto the wall with poor sound insulation in the residence district so as to prevent any interruption caused by operation noise against the residents in the residence district. | ||
- | === Installation requirements | + | === Requirements |
Install the inverter vertically or by backward leaning for 15° so as to facilitate its heat dissipation. | Install the inverter vertically or by backward leaning for 15° so as to facilitate its heat dissipation. | ||
Line 71: | Line 71: | ||
- Align the latch panel to the holes. Plug the expansion bolt through the holes of the latch panel. Use a torque spanner with a 14mm opening to screw up the expansion bolts. The tightening torque is 25N•m. | - Align the latch panel to the holes. Plug the expansion bolt through the holes of the latch panel. Use a torque spanner with a 14mm opening to screw up the expansion bolts. The tightening torque is 25N•m. | ||
- | Fig. 3 10 Fix latch panel | ||
<WRAP center round warning 60%> | <WRAP center round warning 60%> | ||
**CAUTION**\\ To prevent the dust from entering the respiratory tract or the eyes during drilling, operator should wear goggles and dustproof mask. \\ Use a vacuum cleaner to clear the dust inside and outside the holes, measure the layout of holes. Reposition and drill holes if there are any errors. | **CAUTION**\\ To prevent the dust from entering the respiratory tract or the eyes during drilling, operator should wear goggles and dustproof mask. \\ Use a vacuum cleaner to clear the dust inside and outside the holes, measure the layout of holes. Reposition and drill holes if there are any errors. | ||
Line 84: | Line 83: | ||
- Carry the inverter to the installation position. | - Carry the inverter to the installation position. | ||
- Fix the two hanging slots at the back of the inverter onto the latch of the latch panel.\\ {{: | - Fix the two hanging slots at the back of the inverter onto the latch of the latch panel.\\ {{: | ||
- | |||
- | |||
- | ===== Wiring===== | ||