Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
definition:demand_charge_management [2018/12/26 03:26] admin created |
definition:demand_charge_management [2020/09/16 21:41] (current) |
||
---|---|---|---|
Line 19: | Line 19: | ||
There are several implement modes on sensor placement. The first way is adding an extra meter before the loads. The second way is adding an extra meter just behind the existing utility meter. | There are several implement modes on sensor placement. The first way is adding an extra meter before the loads. The second way is adding an extra meter just behind the existing utility meter. | ||
- | Once the EMS reads a peak power rising edge, it shall calculate the target power of the PWS2-30K | + | Once the EMS reads a peak power rising edge, it shall calculate the target power of the inverter |
Demand charge management application requests fast response to the inverter, so the inverter should remain started continuously for instant dispatching. | Demand charge management application requests fast response to the inverter, so the inverter should remain started continuously for instant dispatching. | ||